seanq222
10-16-2007, 03:55 PM
I've been putting together a logo 500 3d and have a question
about the fly bar. For the ball on the flybar cage, the instructions
show flybar cage - ball - washer - bolt. When I put it on this
way the collar on the ball gets pushed into the flybar cage as
the bolt ends up poking through the back side of the cage. If
I put the wash before the ball, this does not happen - i.e. the
asher stops the collar on the ball from pushing into the plastic and the bolt is
the right length. Also, the other balls don't have
washes between the bolt and the wash stops one from removing
the link... Is this perhaps an error in the instructions?
how have others put this together? I guess I could just
add an extra washer to stop the ball going into the flybar
cage.
thanks
sean
about the fly bar. For the ball on the flybar cage, the instructions
show flybar cage - ball - washer - bolt. When I put it on this
way the collar on the ball gets pushed into the flybar cage as
the bolt ends up poking through the back side of the cage. If
I put the wash before the ball, this does not happen - i.e. the
asher stops the collar on the ball from pushing into the plastic and the bolt is
the right length. Also, the other balls don't have
washes between the bolt and the wash stops one from removing
the link... Is this perhaps an error in the instructions?
how have others put this together? I guess I could just
add an extra washer to stop the ball going into the flybar
cage.
thanks
sean