ghettotige
06-01-2008, 11:56 AM
Got the kit yesturday and began the build almost immediately, Have to say the kit goes together lovely, and I have built a few different models in the last 18 months.
Got to the part with the instalation of the rubber sleeve over the feathering spindle applied my soapy water got it half way on to the spindle and then split it wide open
I have continued the rest of the build as I will have to wait until after the week end to order a replacement. I did notice however there is a brass tube inside the same bag that fits over the spindle and looks like it was made to go on instaesd of the rubber version. Is this the case I would have checked the latest manual for info but Avants server is down at the mo.
Got to the part with the instalation of the rubber sleeve over the feathering spindle applied my soapy water got it half way on to the spindle and then split it wide open
I have continued the rest of the build as I will have to wait until after the week end to order a replacement. I did notice however there is a brass tube inside the same bag that fits over the spindle and looks like it was made to go on instaesd of the rubber version. Is this the case I would have checked the latest manual for info but Avants server is down at the mo.