View Single Post
Old 07-12-2009, 10:35 PM   #19 (permalink)
invertmast
Registered Users
 
Posts: 3,335
Thread Starter Thread Starter
 
My HF Map location
Join Date: Oct 2004
Default

Both stabs are complete and ready to be fiberglassed, primed and then surface detailed. The plans for the Vertical stabs arrived and i'm going to build them and the rudders before i do the glass work to the horizontals, that way i can do all four at once (i've got to do a bit of fiberglassing on the rotors of an autogyro i'm buidling for a friend as well). Here are 2 pictures showing the horizontal stabs mounted into the stab bulkheads w/ a 4 foot bubble level for size reference (as if yall haven't gotten enough of these already)


__________________
Comparf Eurosport
1/7 F-14D
Rave 450, scorpion -10, DS285MG, 3500G, Spartan, 4s 2200 outrage, 6100e, 350mm radix
lookin for another Vibe 50
invertmast is offline        Reply With Quote