View Single Post
Old 07-10-2012, 01:15 PM   #5 (permalink)
Tinker
Registered Users
 

Join Date: Mar 2011
Default

Good point about lubricating the tube before trying to assemble the tail unit. I'd forgot to mention that step. This was my first Align build and I had to read and re-read, sometimes read again to make sure I caught everything. Not exactly step by step instructions but as mentioned if you're careful not to try and force anything you should be fine. That rubber part fits so tight in that tail tube that I'd imagine one could easily damage things if you missed the lube step.

I found everything to fit together perfectly during assembly so if you find yourself tempted to force something you've probably either missed a step or you're doing it wrong.
__________________
Gary

T-REX 500 EFL w/SK720, T-REX 250 Pro DFC w/3GX, B400 - FBL with Tarot head, SK720, HiTec digital mg cyclics, boom mount JR DS3500G and T-REX 500 skids, mCPX, UM Planks
Tinker is offline        Reply With Quote